You can see the workload on the job schedule, but the workload schedule provides a 360° view of occupancy rates by site, workshop and resource.
Each site can consult the rate for each workshop individually.
Two rates can be distinguished: the planned rate and the theoretical rate.
The planned workload rate contains only the planned interventions.
The theoretical workload rate includes planned jobs and jobs to be planned (jobs in the column "To be scheduled").
Workshop rates take the resource absences into account.